Kensington Primary School
The re-imagining of a neo-gothic Victorian school house delivering a renovated exterior, replanned interiors, new amenities, new external play areas and comprehensive DDA access.
Design Response
This comprehensive re-imagining of an elegant neo-gothic Victorian school house – built in 1881 and extended in 1915 – carefully restores the external building fabric after removal of the incremental accumulation of wiring, pipework, AC condenser units, emergency escape stairs and other. The front entry door was returned to its original location along with new DDA access ramp and an internal lift giving DDA access to the upper teaching spaces for the first time.
Internally, ad-hoc renovations and additions were stripped out to make way for new reception, administration and meeting room spaces along with reconfigured classroom spaces. A new external fire egress stair was added whilst existing chimney cavities and sub floor spaces were used for the extensive reticulation of services. Structural wall openings were carefully inserted to expand the pokey existing classrooms, pairing them with adjacent sound isolated withdrawal rooms. Acoustic performance was a critical focus with absorptive acoustic linings throughout and a visually open but acoustically isolating operable wall between one pair of classrooms. The neutral but warm internal finishes create an inviting backdrop to the vibrant daily activities of primary school life.
Externally, an infrastructural spine was threaded along the west façade linking new toilets, escape stair and AC equipment cages with a continuous canopy that mediates the connection between the heritage building and the lively play areas in the heart of the school. New landscape elements including planting, seating clusters, yarning circle and ball protection screen are integrated with retained trees and play areas. These elements are sympathetic to the heritage building whilst clearly defined as contemporary additions. The toilet block design responds to issues of gender identity, passive surveillance and maintenance with a cruciform plan that allows views in and out along with a bank of individual toilet cubicles either side with open handwashing areas.
Services Provided
- Full Services
Architect
Workshop Architecture
People
Project Director: James Staughton
Project Team: Jamie Kelson, William Heath, Elliot Meates
Photographer: Peter Bennetts, Gallant LeeDate completed
June 2024
Location
Wurundjeri Country / Kensington
Related projects

Flinders Lane
By delicately combining domestic and exhibition space, visitors to this gallery are provided with a unique, intimate experience of art.

Burk Road Addition
This standalone extension deliberately seeks continuity with the earlier renovation, whilst together sitting in counterpoint to the existing federation era home

Drummond Street Extension
Following on from a previous roof-top addition, this project explores the adjacencies and intimate scales of a garden, attenuated to an everchanging Melbourne climate.

The Dill Pickle Club
The Dill Pickle Club mixes the delights of hi-fidelity music, sophisticated drinks and convivial company within a memorable, atmospheric space.

Tarneit Senior College
The blue and yellow billboard facade cuts through the sparse monotony of outer suburbia to give visual identity in a car dominated environment.

Bayswater Secondary College
Sloping towards Dandenong Creek, the natural setting of the college is embraced by an architecture of rural form and public connectivity.

Newcomb Park Primary School
Built - imaginarily - from a variety of industrial components, reassembled to deliver flexible and intimate spaces that celebrate the once industrial area.

Altona North Primary School
The design of this classroom building draws upon the school’s existing spaces and surroundings to explore a story of context, legacy and change.

Diamond Valley College
Combining new teaching and collaboration spaces to complement existing teaching spaces to form a contemporary STEM teaching facility.


























